← Previous
We are very excited to be working on a new project for TU Delft: GO Zuid. A functional, future proof, climate-adaptive and healthy educational building, which will contribute to the sustainability ambitions of TU Delft to have a CO₂-neutral and circular campus in 2030. In this Total Engineering project Team V is collaborating with Nelissen, Aronsohn, PHI Factory and SkaaL.
The new building features a large atrium, multifunctional education halls and study areas, mainly for students of the Faculty of Aerospace Engineering and Applied Physics. Its circular design will make a positive contribution to the environment and will function as a living room for the surrounding faculties. The completion is scheduled for 2026.
- Share
Related news
HAUT is shortlisted the Amsterdam Best New Building Award
19 May 2023
HAUT is category winner BNA Best Building of the Year 2023!
11 May 2023
HAUT has been completed!
17 March 2022
School kids take lessons in architecture at Team V
25 March 2018
IMC Weekend School at Team V: kids design their dream house
24 January 2017
Site visit of Knightsbridge Hyde Park
3 September 2024
New dune-covered car park opens in Scheveningen
28 July 2024
Four stars for DPG Mediavaert in national newspaper de Volkskrant
4 June 2024
Crossover nominated for Amsterdam New Building Award 2024
25 May 2024
Clubhouse Boompjes Rotterdam topping out
23 April 2024
New project: VrijHaven Amsterdam
12 April 2024
DPG Mediavaert almost completed
11 March 2024
New project Amstelwood in Amstelveen: from gas station to timber hybrid tower
21 November 2023
BREEAM Outstanding Post Construction Certificate for HAUT
19 September 2023
Take a walk through the future Amsterdam South Station
15 September 2023